Hi, I'm needing to install HANA-Optimized Content for CO and I noticed two switches. One for Controlling and one for Controlling (Basis).
Anyone know what the difference is and whether I need to set the switch for the Basis one?
Thanks!
/IMO/RS_BCT_IMO_CO | BW: in-memory optimized Content CO (Controlling) |
/IMO/RS_BCT_IMO_CO_B | BW: in-memory optimized Content CO (Controlling) (Basis) |