At Vendor master I have maintained “No Control”(I have also tried with GR date/Manual option)
At Info record I have maintained “GR Date”At PO level I see price control category is –No Control and if I change it to GR date, system not accepting it
Can you please share a screen shot if you are able to create/save a PO with price date category as-GR date?
Thanks.