Hi Feng Dong,
My master data valid from 01.01.2014.
I plan KP26 in 10.2015
Then I run KP06 in 10.2015 and I had error as above
Hi Feng Dong,
My master data valid from 01.01.2014.
I plan KP26 in 10.2015
Then I run KP06 in 10.2015 and I had error as above