Hi Sid,
I added custom code to highlight the calendar based on the payroll period which I read from T549Q and Calendar highlight is working based on the pay roll period dates .
The below date column should expected to show as from 02/13 to 02/26. but the date column showing as 02/20 to 03/04.
am I missing some thing here?
Thanks
Krishna