Hello,
In capacity leveling transaction ( CM21,CM25 ). Dispatch operation, if there is no capacity available is past then system is not switching the direction to forward.
If 'Change planning direction' is set in strategy profile. In standard SAP there is no way to schedule the forward on the basis of operation status.
Best Regards,
R.Brahmankar