Ship Date Calculation to consider factory calendar

$
0
0

Does anyone know how/ifyou can setup the ship date calculation so that the system considers the factory calendar of the ship to location ( based on the country of that location) ?

 

Basically, we want the system to look at the factory calendar so that it doesn't consider weekends or public holidays defined in the factory calendar. I've looked at the Configurable Process Scheduling configuration and have gotten the system to look either at the transporation calendar (in the means of transport) or the time stream ID defined in the configuration, but it doesn't meet the requirement of just simply using the factory calendar of the ship to location.

.